Senior Design Day - Fall 2024

Welcome To Senior Design Day!

Below are over 40 projects students with the Ingram School of Engineering have spent months developing for this two-semester sequence course.

All links and project pages will be active starting at 1PM December 5th.

Civil Engineering Projects

These Civil Engineering projects are at the midpoint of a
two-semester sequence. They are not complete.

  • C1.01 Scour Bridge 1
    C1.02 Scour Bridge Project
    C1.03 San Marcos Wastewater Force Main
    C1.04 City of Kyle Water Treatment Plant
    C1.05 Pumped Storage Hydropower to Harness Excess Solar Power 
    C1.06 Raptor Refinery Environmental Remediation
    C1.07 Industrial Site Development
    C1.08 Industrial Site Land Development

These Civil Engineering projects are at the endpoint of a
two-semester sequence. They are functionally complete.

  • C2.02 City of Buda T-Intersection Remodel
    C2.03 Water Delivery Pipeline
    C2.04 Horquetas Wastewater Treatment Plant
    C2.05 Industrial Warehousing Development
    C2.06 Dynamic Industrial Warehousing Complex


Electrical Engineering Projects

These Electrical Engineering projects are at the midpoint of a
two-semester sequence. They are not complete.

  • E1.01 Radiation-Tolerant Crew Laptop
    E1.02 L3 Energy
    E1.03 Texas State Sunbeams: Power Distribution Analysis
    E1.04 Lunar Concrete Mixer
    E1.05 Satellite Antenna Array
    E1.06 Ouroboros Guitar Looper Pedal
    E1.07 The Artistic Automaton
    E1.08 Artist Robot
    E1.09 S.R.N. Robotics
    E1.10 Push-Pull Bot

These Electrical Engineering projects are at the endpoint of a
two-semester sequence. They are functionally complete.

  • E2.01 Integrated Camera & Lighting System Optical Optimization
    E2.02 ACTS Project
    E2.03 PCBInnovate
    E2.04 Urban Hotspots
    E2.05 San Marcos Heat
    E2.06 NaviBot
    E2.07 King Aegeus


Industrial Engineering Projects

These Industrial Engineering projects are at the midpoint of a
two-semester sequence. They are not complete.

  • I1.01 Polimeros Opticos Demand Planning 
    I1.02 Supply Chain Planning for Optimized Demand Fulfillment
    I1.03 Net-Zero Charging Infrastructure for Electric Aircrafts

These Industrial Engineering projects are at the endpoint of a
two-semester sequence. They are functionally complete.

  • I2.01 PCB Mating Fixture & Teaching Jig
    I2.02 Enhancing Operations for Meals on Wheels
    I2.03 Model for Product Introduction Across Global Manufacturing Sites


Manufacturing Engineering Projects

These Manufacturing Engineering projects are at the midpoint of a
two-semester sequence. They are not complete.

  • M1.01 Bobcat Racer Wheel Assembly
    M1.02 Non-Lethal Smart Projectile
    M1.03 Improve the Lighthouse Bend EZ Punch Machine Operation

These Manufacturing Engineering projects are at the endpoint of a
two-semester sequence. They are functionally complete.

  • M2.01 Punch Cap Vibratory Feeding System
    M2.02 CAD Pit Stop: Refining Digital Assets
    M2.03 Solar Panel Automation
    M2.04 Car Braking System Design & Optimization
    M2.05 Synchronous Drive
    M2.06 Calendaring Rolling Mill