C2.03 - Water Delivery Pipeline
Potable water transmission line for local utility
Sponsor: HDR, GBRA
Student Team: Benjamin Lehrer (PM) Dylan McConnell, Kallen Rangnow, Rachel Mondy
Faculty Advisor: Dr. Felipe Gutierrez
The purpose of this project is to deliver potable water from north Lockhart to south Austin through the use of piping, formally called a water transmission line (WTL). This WTL project consists of the design and placement of a roughly 10.5 mile pipeline, pump station, ground storage tank, and elevated storage tank. The water will be supplied by the Guadalupe-Blanco River Authority (GBRA), and our team will design the route and placement to provide a safe, efficient, and affordable water transmission line.
C2.03 Presentation
Video not playing? You can also view our presentation by clicking the link below!
C2.03 Poster Pitch
To view a PDF file of our poster, click the link below!
Team Contact Information
Team Project Manager: Benjamin Lehrer, tnl51@txstate.edu
Faculty Advisor: Dr. Felipe Gutierrez, wgy8@txstate.edu
Let us know what you think! You can evaluate our project here: C2.03 Evaluation Form