I1.01 - EV Charging Infrastructure Planning Project

Forecast Infrastructure for EV Charging Stations.

Sponsor: Ingram School of Engineering
Student Team: Andrea Barreto, Jose Castillo, Jonathan Guillen, Justin Williams
Faculty Advisor: Dr. Michelle Londa

I1.01 Logo
I1.01 Logo

As the private and commercial availability of EV's grows over the next couple of decades, so does the energy required to provide dependable charging for the Electric Vehicle fleet. In order to have a zero-carbon emission future, infrastructure for the charging stations will have to use energy from renewable sources such as a wind and solar.

I1.01 Poster Pitch

To view a PDF file of our poster, click the link below!

I1.01 Poster.pdf

Team Contact Information

I1.01 Team Photo
From left to right (Andrea Barreto, Justin Williams, Jonathan Guillen, Jose Castillo)

Team Project Manager: Andrea Barreto, acb258@txstate.edu

Faculty Advisor: Dr. Michelle Londa, ml40@txstate.edu


Let us know what you think! You can evaluate our project here: I1.01 Evaluation Form