C1.04 - Wastewater Management

Wastewater treatment for the future.

Sponsor: Ingram School of Engineering
Student Team: Caden Pugh, Barrett Guinn, Jack Butcher, Wade Watson 
Faculty Advisor: Dr. Feng Hong

C1.04 Logo
C1.04 Logo

With the rate of population growth in the Texas Triangle, infrastructure facilities must be upgraded. For this project, wastewater facilities must be designed for a proposed 2,500 home single family housing development in the San Marcos area. Tasked with finding the solution for the wastewater from this housing development, our team has brainstormed multiple options. These include routing the wastewater from the housing development to the existing San Marcos Wastewater Treatment Plant, designing and constructing a new wastewater treatment plant to service our housing development and any future developments in the area, or designing a state of the art, closed-circuit wastewater recycling system.

C1.04 Poster Pitch

To view a PDF file of our poster, click the link below!

C1.04 Poster.pdf

Team Contact Information

C1.02 Team Photo
From left to right (Caden Pugh, Barrett Guinn, Jack Butcher, Wade Watson)

Team Project Manager: Barrett Guinn, bsg47@txstate.edu

Faculty Advisor: Dr. Feng Hong , dld249@txstate.edu


Let us know what you think! You can evaluate our project here: C1.04 Evaluation Form