I2.01 - Electric Vehicle Service Infrastructure

Planning Texas electric vehicle service infrastructure for zero energy operations through 2040.

Sponsor: EPRI & Ingram School of Engineering
Student Team: Andrea Barreto, Jose Castillo, Jonathan Guillen, Justin Williams
Faculty Advisor: Dr. Michelle Londa, Dr. Tongdan Jin, & Dr. Tao Ma

I2.01 Logo
I2.01 Logo

As the private and commercial availability of EV's grows over the next couple of decades, so does the energy required to provide dependable charging for the Electric Vehicle fleet. In order to have a zero-carbon emission future, infrastructure for the charging stations will have to use energy from renewable sources such as a wind and solar

I2.01 Project Presentation

Video not playing? You can also view our presentation by clicking the link below!

I2.01 Project Presentation

I2.01 Poster Pitch

To view a PDF file of our poster, click the link below!

I2.01 Poster.pdf

Team Contact Information

Team Project Manager: Andrea Barreto, acb258@txstate.edu

Faculty Advisor: Dr. Michelle Londa, ml40@txstate.edu, Dr. Tongdan Jin, tj17@txstate.edu, & Dr. Tao Ma, vjy13@txstate.edu

I2.01 Team Photo
From left to right (Jonathan Guillen, Jose Castillo, Andrea Barreto, Justin Williams)

Let us know what you think! You can evaluate our project here: I2.01 Evaluation Form