C2.05 - Rehabilitation of Lake Dunlap Dam
Analyzing the best method to rehabilitate the Lake Dunlap Dam.
Sponsor: Ingram School of Engineering
Student Team: Richard Kortz, Sydney McKean, Sarah Brooks, Andrew Price
Faculty Advisor: Dr. Feng Hong
After analysis of three different alternatives, our chosen solution to rehabilitate the Lake Dunlap Dam after its failure in May 2019 was determined to be replacing the Bear Trap style spill gates. Our project will focus on the installation of three new crest Hydraulic Actuated spill gates. This includes a detailed system design of the gates and a related component design. As well as, an evaluation of the sustainability of the chosen solution.
C2.05 Presentation
Video not playing? You can also view our presentation by clicking the link below!
C2.05 Poster Pitch
To view a PDF file of our poster, click the link below!
Team Contact Information
Team Project Manager: Richard Kortz, r_k116@txstate.edu
Faculty Advisor: Dr. Feng Hong, dld249@txstate.edu
Let us know what you think! You can evaluate our project here: C2.05 Evaluation Form