C1.05 - High-Performance Concrete Box Culvert Bridge Replacement

Improving structure of an existing bridge.

Sponsor: TxDOT 
Student Team: Bryan Garza, Arturo Figueroa, Julian Garcia, Kamden Dziuk  
Faculty Advisor: Dr. Felipe Gutierrez

C1.05 Logo
C1.05 Logo

Under TxDOT's sponsorship, we will be conducting a hands on design project regarding a small bridge crossing over a proposed channel located in Corpus Christi. This project will allow us to examine bridge infrastructure within the state of Texas, and multiple alternatives pertaining to our current bridge's design. At the end of this project, we will be able to understand the planning process and decision evaluation involved within Texas infrastructure's planning and design phases.

C1.05 Poster Pitch

To view a PDF file of our poster, click the link below!

C1.05 Poster.pdf

Team Contact Information

C1.05 Team Photo
From left to right (Kamden Dziuk, Arturo Figueroa, Bryan Garza, Julian Garcia)

Team Project Manager: Kamden Dziuk, kbd54@txstate.edu

Faculty Advisor: Dr. Felipe Gutierrez, wgy8@txstate.edu


Let us know what you think! You can evaluate our project here: C1.05 Evaluation Form