C1.04 - Water Supply Project
Designing a new water line for the ARWA.
Sponsor: Hannah Leppla, Plummer Associates, Inc.
Student Team: Carlo Falco, Andrea Ibarra, Colby She
Faculty Advisor: Dr. Yongtao Dong
In 10 years, Hays county has nearly doubled in population. Water demand has increased at a similar rate. Without significant expansion, demand would outpace supply in as little as 10 years. The Alliance Regional Water Authority seeks to establish a water supply system that supplements the current water supply for Hays, Caldwell, and Comal counties with the groundwater from the Carrizo-Wilcox aquifer. Our team seeks to optimize design between Maxwell and south Kyle, including a booster station near Maxwell.
C1.04 Poster Pitch
To view a PDF file of our poster, click the link below!
Team Contact Information
Team Project Manager: Carlo Falco, bcf53@txstate.edu
Faculty Advisor: Dr. Yongtao Dong, fyg12@txstate.edu