I1.02 - Tool Inventory and Facility Planning

Organize tool inventory and create facility layout

Sponsor: Monterrey Iron and Metal, Jordan Vexler
Student Team: Cramer Townsley, Katherine Stuckly
Faculty Advisor: Dr. Michelle Londa

I1.02 Logo
I1.02 Logo

The goal of this project is to provide an organized tool inventory and facility layout for Monterrey Iron and Metal. The inventory spreadsheet will allow the company to know what tools are available and when reordering is needed. This project will consist of optimization within Monterrey Iron and Metal tool shed, including shelf layout and tool placement based on how often tools are used and worker logic. The study of tool usage and ergonomics will provide an organized and safer work environment for the employees as well as save money for the company by minimizing the number of tools ordered.

I1.02 Poster Pitch

To view a PDF file of our poster, click the link below!

I1.02 Poster.pdf

Team Contact Information

I1.02 Team Photo
From left to right (Cramer Townsley, Katherine Stuckly)

Team Project Manager: Cramer Townsley, cmt182@txstate.edu

Faculty Advisor: Dr. Michelle Londa, ml40@txstate.edu


Let us know what you think! You can evaluate our project here: I1.02 Evaluation Form